Bankside School

When Bankside School confirmed that they were going to build a new ‘energy efficient’ building to accommodate up to 630 pupils, as well as 52 nursery children and extra community facilities, they asked Ecovision to design something suitable .

Ecovision designed a system incorporating a 50kW Ground Source Heat pump linked to 18 boreholes of 100m each.

The School is heated through an underfloor system designed to operate with a peak flow temperature of 40 degrees. To increase the efficiency the system is weather compensated. All helping to create a new energy efficient building.