by | Jun 11, 2015 | Uncategorized
Houghton Primary Care Unit Opens using unique heat pump integration technology. Houghton’s new £21m Primary Care Centre is now open to the public. The fourth centre of its kind to be built in Sunderland, has been developed by NHS South of Tyne and Wear, working on...
by | Jun 11, 2015 | Uncategorized
Epworth Primary School Epworth Primary School decided to take the opportunity when planning their new School building to install renewable energy. The School is a good example of the many small Schools that Ecovision have helped when designing the most efficient...
by | Jun 11, 2015 | Uncategorized
Stunning Vicarage Design Breaks with Tradition and gives the Church a new, exciting and Modern Look. St John’s Vicarage in Wembley is the first of its kind in the country, the greenest Vicarage in the UK. The traditional perception of a Vicarage is a sombre building...
by | Jun 11, 2015 | Uncategorized
Sophisticated Heat Pump system for Hayesfield School. Hayesfield School has opened a new Performing Arts Centre which has a highly sophisticated heat pump system allowing for heating and cooling through different emitter systems. The new Arts Centre has been put...
by | Jun 11, 2015 | Uncategorized
Wyke College builds one of the UK’s largest 6th form centres Wyke Sixth Form College opened in 1988 and was originally intended for 16 – 19 year olds in the western part of Hull, but it very quickly gained a wider reputation beyond the city. Wyke Sixth Form is now...
by | Jun 11, 2015 | Uncategorized
Daresbury Science and Innovation Centre – Currently has one of the largest open loop installations in the UK, capable of drawing 30 litres per second from the ground. Vinci approached Ecovision to design a renewable energy system that could allow the new building to...