by | Jun 11, 2015 | Uncategorized
The original building at Haileybury College in Hertfordshire dates back to 1806 and was designed in neo-classical style. The decision was taken to build a new languages block in the grounds, which would contrast with the existing structure but also work in sympathy...
by | Jun 11, 2015 | Uncategorized
Whitton School, The school needed to update the changing rooms, all the school teams were using the pitches but there was not enough hot water for all of them to have shower, the cost of producing what they had was also very high. Ecovision designed a new system for...
by | Jun 11, 2015 | Uncategorized
Glengarry Castle Hotel is a charming Scottish country property situated in a beautiful location on the edge of Loch Oich, which lies between Loch Ness and Loch Lochy at the heart of the Great Glen in the Highlands of Scotland. Originally designed and constructed by...
by | Jun 11, 2015 | Uncategorized
Houghton Primary Care Unit Opens using unique heat pump integration technology. Houghton’s new £21m Primary Care Centre is now open to the public. The fourth centre of its kind to be built in Sunderland, has been developed by NHS South of Tyne and Wear, working on...
by | Jun 11, 2015 | Uncategorized
Epworth Primary School Epworth Primary School decided to take the opportunity when planning their new School building to install renewable energy. The School is a good example of the many small Schools that Ecovision have helped when designing the most efficient...